Oracle神谕

  BlogJava :: 首页 :: 新随笔 :: 联系 :: 聚合  :: 管理 ::
  284 随笔 :: 9 文章 :: 106 评论 :: 0 Trackbacks

For each order proposal, the system calculates the date that it must be converted into either a purchase order or a production order so that the purchase order can be sent to the vendor on time or the production order can be transferred to production on time. Naturally, the vendor can only deliver the ordered quantity punctually if he receives the purchase order on time. The same applies to production - the ordered quantity can only be produced according to schedule if the production order is received on time.

posted on 2008-06-19 23:00 java世界畅谈 阅读(208) 评论(0)  编辑  收藏 所属分类: 供应链及物流

只有注册用户登录后才能发表评论。


网站导航: